-Dry Construction-
Project for the construction of a block of flats solving in detail all the construction encounters, using dry construction methods.
The objective of this project is to know how to solve a constructive detail, knowing which is the desired final form and function, taking into account the environment in which we find ourselves and always being respectful with the environment, therefore dry construction methods are used . And the important thing about this project is to learn to solve all the constructive details together, so that the whole building works in harmony.
From the formalization of the façade to the detailed resolution of the rainwater downspout of the roof, this in the exterior of the building and in the interior the formalization of the false ceiling or resolution of the laminated plaster walls to the construction detail of the encounter of a door with the wall or the downspout of a bathroom.
-Rehabilitation of the Mas-
La Mas rehabilitation project, from the early 20th century in the municipality of Fraga, Huesca.
The project consists of three phases, in the first phase the current state of the building was mapped. This representation of the current state helped to understand how it was built, even making stratigraphic plans identifying when each element of the building was built. The second stage focuses on the identification and representation of all the pathologies present in the building, from the mechanical origin to the biological origin, thus coming to identify what were the causes of these pathologies. And in the third stage, the best way to fix each detected pathology is studied and decided, and once the pathologies have been healed, energy improvement is carried out. Which supposes an intervention in the whole building, from the solution to the thermal bridges to the heating of the building.
In this project, discipline is acquired to be able to intervene in any type of building and to be able to solve its problems in the best possible way.